Advanced Construction Planning & Scheduling with Primavera P6 Professional
Course Objectives & Learning Outcomes:
By the end of this training program, participants will be able to:
- Apply international building codes and engineering standards in structural design within Advanced Construction Planning & Scheduling with Primavera P6 Professional.
- Supervise construction site execution, concrete pours, and structural steel erection.
- Perform precise quantity surveying, cost estimation, and contractor payment certifications.
- Enforce site QA/QC protocols, materials sampling, and laboratory testing procedures.
- Manage construction site structural safety, scaffolding inspection, and deep excavation controls.
- Utilize modern BIM (Building Information Modeling) and structural analysis software.
Development of Work Breakdown Structures (WBS), Critical Path Method (CPM) analysis, resource and cost loading, schedule baseline tracking, and executive project performance reporting.
| # | date venue | Training City | |
|---|---|---|---|
| 1 | 2026-Nov-22 - 2026-Nov-26 | Malaysia | register |
| 2 | 2026-Nov-29 - 2026-Dec-03 | Cairo | register |
| 3 | 2026-Dec-06 - 2026-Dec-10 | Dubai | register |
| 4 | 2026-Dec-13 - 2026-Dec-17 | Istanbul | register |
| 5 | 2026-Dec-20 - 2026-Dec-24 | Sharm elshikh | register |
| 6 | 2026-Dec-27 - 2026-Dec-31 | London | register |
| 7 | 2027-Jan-03 - 2027-Jan-07 | Cairo | register |
| 8 | 2027-Jan-03 - 2027-Jan-07 | Cairo | register |
| 9 | 2027-Jan-10 - 2027-Jan-14 | Dubai | register |
| 10 | 2027-Jan-10 - 2027-Jan-14 | Dubai | register |
| 11 | 2027-Jan-17 - 2027-Jan-21 | London | register |
| 12 | 2027-Jan-17 - 2027-Jan-21 | London | register |